
Add to Cart
With the gimbal driving system , the C purlin forming machine has much stronger driving power and is more stable when forming the purlins. Using the PLC control system or handle wheel, the C purlin forming machine automatically adjusts while forming any width of the purlins.It saves time and is much easier than adjusting the spacers of the rollers.
1.Profile drawing
We can also design C purlin rollformer according to your specific profile drawing.
Size C |
A |
B |
E |
100 |
100 |
50 |
15 |
150 |
150 |
65 |
18 |
200 |
200 |
75 |
20 |
250 |
250 |
75 |
20 |
300 |
300 |
85 |
25 |
350 |
350 |
100 |
25 |
400 |
400 |
100 |
|
2.The work flow
Major equipments we designed as below:
A - Hydraulic decoiler ..............................................To load and uncoliing material
B - Feeding applicator ................................................................................Infeeder
C - Levelling................................................................................................To level
D - Roll forming..............................................................................To roll as profile
E - Hydraulic cut.......................................................To cut tiles at desired length
F - Output table ...................................................................... Support the finished
3.Flow chart:
4. Specification
Productivity | C channel as the drawing |
Man Power Required | One operator with one assinstant |
Number of Stations | 14-23 sets(7 rolls for leveling) |
Thickness | 1.5-3.0mm |
Main Power | 15 KW |
Machine Frame | H-BEAM Frame |
Set Up time | 15 mins |
Working Hours per Day | 8 to 16 |
Machine Height | 1.5m |
Length Required | 12.6m |
5. Rollformer
6.Packing
7.product
8.Exposition Information
9.Our company and workshop
10.Our Office and Customer :
11.Certification:
12.Gurantee and After-sale Serive:
- The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
-The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)
13.Contact Us:
Welcome to contact and visit us, waiting for your cooperation sincerely.